Sheerness Dockyard Church

From a roofless, fire-damaged ruin to a welcoming community and enterprise hub for the Isle of Sheppey.

Discuss your building
Sheerness Dockyard Church after restoration, from the air
Sheerness Dockyard Church lit at dusk after restoration

Conservation architects

A landmark reborn

Authentically restoring the historic fabric while re-presenting the interior for a new civic purpose

Building
Grade II* listed, 1828, by George Ledwell Taylor
Client
Sheerness Dockyard Preservation Trust
Project
£9.5m, with Hugh Broughton Architects

Damaged by fire in 1881 and gutted again in 2001, the church was one of the most important buildings at risk in the South East. Conservation of the external fabric, a new roof, windows and doors made it weather tight and allowed the careful restoration of the remaining original plasterwork.

Inside, 14 discrete flexible pavilions house a café, co-working space and business incubation units, and can be removed without touching the original fabric.

“It is a completely honest and faithful restoration, with absolutely no attempt to hide or disguise the condition of the original facade.”

Stone Federation, 2024
The roofless church interior under scaffolding before restorationThe restored interior with new work spacesA restored stone staircase

“The space is beautifully light, the acoustics comfortable, and a newly insulated floor and highly insulated roof mean that the building can be maintained at a pleasant temperature.”

The RIBA Journal, 2025

Awards and recognition

  • 2025RIBA National Award · RIBA Reinvention Award
  • 2025RIBA South East Award, Building of the Year and Conservation Award
  • 2024RICS UK Awards, Project of the Year and Heritage Project winner
  • 2024RICS South East Awards, Heritage Project winner
  • 2024Civic Trust Awards, Highly Commended
  • 2024Natural Stone Awards, Highly Commended
  • 2024MacEwen Awards, shortlisted for Heritage Renewal
  • 2023Georgian Group, Best Reuse of a Georgian Building
The restored nave with its cast iron structure

Who made it happen

Funded by The National Lottery Heritage Fund, Historic England and numerous other supporters.

Client
Sheerness Dockyard Preservation Trust
Design architects and lead consultant
Hugh Broughton Architects
Conservation architects
Martin Ashley Architects
Main contractor
Coniston Construction
Structural engineer
Hockley & Dawson
Services engineer
Harley Haddow
Cost consultant
PT Projects
Project manager
Glevum Consulting